Dropped kerbs and crossovers enable vehicles to access property. If you want to construct a dropped kerb so that you can access your property you need to apply to the council for permission.
Permission lasts for 12 months.
If this application is successful then an administration fee of £43 will be invoiced.
it takes two weeks to process an application.
You must use contractor approved by us to carry out the works.
Permission lasts for 12 months.
Download the application form for a vehicle access crossing.
Return the completed forms (along with a plan showing the preferred location of the proposed crossing) to the Streetworks Engineer. Do not enclose payment, when permission has been granted an invoice will be raised.
Download the application form for vehicle access crossing improvement.
Return the completed forms (along with a plan showing the preferred location of the proposed crossing) to the Streetworks Engineer. Do not enclose payment, when permission has been granted an invoice will be raised.
Streetworks Engineer
9 St Leonard Place, York YO1 5ET
tel: (01904) 551361
fax: (01904) 551492
email:
streetworks
@york.gov.uk
Report problems with dropped kerbs
You can report problems with dropped kerbs using our online form