Dropped kerbs and crossovers

Dropped kerbs and crossovers enable vehicles to access property. If you want to construct a dropped kerb so that you can access your property you need to apply to the council for permission.

Permission lasts for 12 months.

Cost

If this application is successful then an administration fee of £43 will be invoiced.

it takes two weeks to process an application.

Are there any rules?

You must use contractor approved by us to carry out the works.

Permission lasts for 12 months.

Apply for permission to construct a dropped kerb

Download the application form for a vehicle access crossing.

Return the completed forms (along with a plan showing the preferred location of the proposed crossing) to the Streetworks Engineer. Do not enclose payment, when permission has been granted an invoice will be raised.

Apply for permission for improvement to an existing dropped kerb

Download the application form for vehicle access crossing improvement.

Return the completed forms (along with a plan showing the preferred location of the proposed crossing) to the Streetworks Engineer. Do not enclose payment, when permission has been granted an invoice will be raised.

Pavements

Contact

Streetworks Engineer
9 St Leonard Place, York YO1 5ET
tel: (01904) 551361
fax: (01904) 551492
email: streetworks
@york.gov.uk

Quick links

Report problems with dropped kerbs
You can report problems with dropped kerbs using our online form