Skip to Content

City Of York Council

York800 - 800 Years of the City of York

Access York - Best and Final Funding Bid documents

These documents form part of the Best and Final Funding Bid which was submitted to the Department for Transport (DfT) on 9 September 2011. 

The Major Scheme process is used by the DfT to evaluate and approve funding for large transport projects across the country. For further information please contact the City Strategy Capital Programme Manager on 01904 551641.

The DfT granted funding for the project identified in the Best and Final Bid on 30 November 2011.

PDF Volume 1 Best and Final Funding Bid (6.33MB)

PDF Volume 2 Value for Money Report and Appendices  (27.8MB)

Transport modelling supporting documents

PDF SD1 - Local Model Validation Report (5.73MB)

PDF SD2 - Public Transport Model Calibration and Validation (2.25MB) 

PDF SD3 - Modelling and Appraisal Update 260711 (216KB)

Background information

PDF Modelling and Appraisal Plan (May 2011) (512KB)

PDF Modelling and Appraisal Update (July 2011) (186KB)

Drawings

The scheme drawings have been updated to match the latest proposals for the sites and highway works.  Further design and detailed consultation will be progressed for the highway works prior to finalising.

PDF Park & Ride Network Map (103KB) 

PDF Askham Bar Proposed Site Layout (2.06MB) 

PDF A59 Poppleton Bar Proposed site layout (2.85MB)

PDF A59/A1237 Proposed Roundabout Upgrade (959KB)

PDF A59 Proposed Corridor Improvements (4.82MB)

Programmes

The programme shows the anticipated timescales of the project if funding is confirmed in December 2011.

PDF Programme (47.6KB)