These documents form part of the Best and Final Funding Bid which was submitted to the Department for Transport (DfT) on 9 September 2011.
The Major Scheme process is used by the DfT to evaluate and approve funding for large transport projects across the country. For further information please contact the City Strategy Capital Programme Manager on 01904 551641.
The DfT granted funding for the project identified in the Best and Final Bid on 30 November 2011.
Volume 1 Best and Final Funding Bid (6.33MB)
Volume 2 Value for Money Report and Appendices (27.8MB)
Transport modelling supporting documents
SD1 - Local Model Validation Report (5.73MB)
SD2 - Public Transport Model Calibration and Validation (2.25MB)
SD3 - Modelling and Appraisal Update 260711 (216KB)
Modelling and Appraisal Plan (May 2011) (512KB)
Modelling and Appraisal Update (July 2011) (186KB)
The scheme drawings have been updated to match the latest proposals for the sites and highway works. Further design and detailed consultation will be progressed for the highway works prior to finalising.
Park & Ride Network Map (103KB)
Askham Bar Proposed Site Layout (2.06MB)
A59 Poppleton Bar Proposed site layout (2.85MB)
A59/A1237 Proposed Roundabout Upgrade (959KB)
A59 Proposed Corridor Improvements (4.82MB)
The programme shows the anticipated timescales of the project if funding is confirmed in December 2011.